Apple Blossom

Type
Business Segment
Sempra Infrastructure
Capacity
100 megawatts; Homes powered: About 38,000
Detailed Info

The 100-megawatt Apple Blossom wind farm, under construction in Huron County, Michigan, will provide enough electricity to power about 38,000 Michigan homes and will reduce greenhouse gas emissions by about 205,000 tons annually.

General Location
Huron County, MI
Location Latitude
-83.306944
Location Longitude
43.848333
Image
Capacity
  • 100 megawatts
  • Homes powered: About 38,000