Traffic Advisory: Lanes to Be Reduced Along 190th Street in Redondo Beach for Pipeline Project Beginning September 16

Date
Body

WHAT: SoCalGas will be performing work for a pipeline project on 190th Street in Redondo Beach between Cluster Lane and Blossom Lane/North Beryl Street starting September 16. Work is expected to continue through November 2019. 

To perform this project safely, lane reductions will be in place from 8:30 a.m. to 4:30 p.m., Monday through Friday, on the east and westbound sides of 190th Street between Cluster Lane and Blossom Lane/North Beryl Street. 

Traffic control cones and flagmen will help direct the flow of traffic. Residents may hear work-related noise, see excavation equipment and

New Industrial Drying System Promises to Save Water and Reduce Energy Use by 65 Percent

Date
Body

LOS ANGELES, Sept. 12, 2019 /PRNewswire/ -- Today, Southern California Gas Co. (SoCalGas) and Gas Technology Institute (GTI) announced they have successfully demonstrated a new industrial drying technology that uses far less energy, reduces greenhouse gas emissions and saves money. The new technology can be used for drying or heat processing across a

Traffic Advisory: Lanes to Be Reduced Along W. Crosby Street in Altadena for Pipeline Project Beginning September 16

Date
Body

WHAT: SoCalGas will be performing work for a pipeline project on W. Crosby Street in Altadena starting September 16. Work is expected to continue through November 2019. 

To perform this project safely, street closures and lane reductions will be in place from 7:00 a.m. to 5:00 p.m., Monday through Thursday, on a portion of W. Crosby Street S. near N. Lincoln Avenue. 

Traffic control cones and flagmen will help direct the flow of traffic. Residents, local businesses, and commuters may hear work-related noise and see excavation equipment and vehicles and experience traffic delays during

Sempra Energy Declares Common And Preferred Dividends

Date
Body

SAN DIEGO, Sept. 6, 2019 /PRNewswire/ -- Today, the Sempra Energy (NYSE:SRE) board of directors declared a quarterly dividend of $0.9675 per share of common stock. The common stock dividend is payable Oct. 15, 2019, to common stock shareholders of record at the close of business on Sept. 20, 2019.

The company's board of directors also declared a

Traffic Advisory: Lane Reductions on Imperial Highway Off-Ramp and Croesus Avenue for Pipeline Installation Project

Date
Body

WHAT: SoCalGas will begin a pipeline installation project in the vicinity of Imperial Highway and Croesus Avenue starting on September 3rd.  Crews will upgrade the existing natural gas main and service  connections on Croesus Avenue in Los Angeles.

To perform this work safely, lane reductions on the Imperial Highway off-ramp from the 105 Freeway and on Croesus Avenue will be in effect during work hours.

Residents and local businesses may hear some work-related noise. During work hours, commuters passing by the work site will see excavation, equipment and vehicles.

No interruption to natural

Sempra Energy Media Statement On Agreements For Mexican Pipelines

Date
Body

SAN DIEGO, Aug. 27, 2019 /PRNewswire/ -- Sempra Energy (NYSE: SRE) today issued the following statement in response to agreements reached between its Mexican subsidiary, Infraestructura Energética Nova, S.A.B. de C.V. (IEnova), and the Comisión Federal de Electricidad (CFE) on the Guaymas-El Oro pipeline and the Sur de Texas-Tuxpan marine pipeline, a

Cameron LNG Commences Commercial Operations For Train 1 Of Liquefaction-Export Project

Date
Body

SAN DIEGO, Aug. 19, 2019 /PRNewswire/ -- Sempra LNG, a Sempra Energy (NYSE: SRE) subsidiary, today announced that Cameron LNG's first train of the liquefaction-export project in Hackberry, La., has begun commercial operations under Cameron LNG's tolling agreements.

"This is an exciting moment for Cameron LNG and for Sempra Energy," said Carlos Ruiz

SoCalGas to Begin Pipeline Installation Project in Buena Park, Anaheim, and Stanton Beginning August 19

Date
Body

WHAT: SoCalGas will install new, natural gas pipeline along Dale Avenue from La Palma Avenue in Buena Park through Southwest Anaheim and ending at Standustrial Street in Stanton. Work is 
scheduled to begin Monday, August 19, 2019. 

This new pipeline will provide natural gas to the yet to be constructed, Stanton Energy Reliability Center. Work is expected to continue through December 2019. 

To perform this project safely, lanes will be reduced in both northbound and southbound directions along Dale Avenue. 

Traffic control cones, message boards and flagmen will help direct the flow of

SoCalGas Declares Preferred Dividends

Date
Body

LOS ANGELES, Aug. 15, 2019 /PRNewswire/ -- The board of directors of Southern California Gas Co. (SoCalGas) has

SoCalGas and Electrochaea Announce Commissioning of New Biomethanation Reactor System Pilot Project

Date
Body

LOS ANGELES, Aug. 13, 2019 /PRNewswire/ -- Southern California Gas Co. (SoCalGas) and Electrochaea today announced the commissioning of the nation's first scalable biomethanation reactor system at the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) Energy System Integration Facility in Golden, Colo.  The technology uses